San Ramon Valley Fire Protection District
Home MenuPlan Review Fees
Effective July 1, 2024
Planning and Site Development
Pre-application Design Review - per hour
To meet to discuss potential requirements, design criteria, hardships, proposed mitigation of requirements, etc (first hour no charge).
$412
Planning and Site Development Review - per hour
Includes review and comments for planning applications and associated community development process requirements.
$412
Emergency Response Pre-plan
An emergency response pre-plan is required if determined necessary by the fire code official due to size, use, or special existing hazard.
Actual Cost
Plan Check and Construction Permits
Automatic Fire Extinguishing Systems - per system
NFPA 13 & 13R wet, dry, pre-action
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspections for all required inspections
New system first 20 heads | $977 |
New system each additional 20 heads | $108 |
Modification to an existing system first 20 heads | $771 |
Modification to an existing system each additional 20 heads | $108 |
Engineered Systems
Clean agent, commercial cooking, wet and dry chemical, CO2
Includes (1) plan review, (1) re-submittal, (1) final inspection
$695
NFPA 13D new and modifications
Includes (1) plan review, (1) re-submittal, (1) overhead inspection and (1) final inspection
$749
Energy Storage Systems - per system
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
$599
Compressed Gases - per system
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
Storage, use or handling | $599 |
Medical gas systems | $1,048 |
Refrigeration systems |
$899 |
Cryogenic Fluids
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
$755
Emergency Responder Radio Coverage System
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
$1,422
Fire Alarm and Detection Systems and Related Equipment - per system
Includes (1) plan review, (1) re-submittal, (1) final inspection
New system first 20 devices | $837 |
New system each additional 20 devices | $300 |
Modification to an existing system first 20 devices | $771 |
Modification to an existing system each additional 20 devices | $300 |
Fire sprinkler monitoring system | $599 |
Smoke and heat vent system | $978 |
Fire Pumps and Related Equipment - per system
Includes (1) plan review, (1) re-submittal and (1) field inspection and (1) re-inspection for all required inspections
New installation | $1,498 |
Modifications or repairs | $599 |
Flammable and Combustible Liquids
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
Aboveground and underground storage tanks including equipment - per tank | $599 |
Aboveground and underground tank removal - per tank | $668 |
Vapor recovery systems - per system | $599 |
Fuel Cell Power Systems
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
$600
Gas Detection Systems
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
$600
Gates and Barricades Across Fire Apparatus Access Roads
Includes (1) plan review, (1) re-submittal, (1) field inspection
$600
Hazardous Materials
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
Use and storage | $978 |
Chemical classification | $599 |
High-Piled Combustible Storage
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
New installation | $978 |
Modifications or repairs | $653 |
Industrial Ovens - per oven
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
$503
LP-gas - per system
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
New installation | $771 |
Modifications or repairs | $661 |
Motor Vehicle Repair Rooms and Booths
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
New installation | $538 |
Modifications or repairs | $396 |
Private Fire Hydrants and Fire Protection Water Supplies - per system
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection for all required inspections
Private fire hydrant systems | $1,198 |
Fire protection system water supply | $899 |
Rural water supply system | $924 |
Temporary water supply system | $599 |
Smoke Control or Smoke Exhaust Systems
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
New installation | $1,423 |
Modifications or repairs | $660 |
Solar Photovoltaic Power Systems
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
$771
Spraying or Dipping - per system
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
New installation | $539 |
Modifications or repairs | $395 |
Standpipe Systems - per system
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection for all required inspections
New installation | $987 |
Modifications or repairs | $463 |
Temporary Membrane Structures and Tents - per tent
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
$385
Construction, Alternation or Renovation of a Building (for which a building permit is required)
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
Commercial new or addition | 0 - 5,000 sq ft | $1,048 |
Commercial new or addition | 5,001 - 10,000 sq ft | $1,757 |
Commercial new or addition | 10,001 - 20,000 sq ft | $2,263 |
Commercial new or addition each additional 10,000 sq ft | $394 | |
Commercial alteration or renovation | 0 - 5,000 sq ft | $779 |
Commercial alteration or renovation | 5,001 - 10,000 sq ft | $939 |
Commercial alteration or renovation | 10,001 - 20,000 sq ft | $1,191 |
Commercial alteration or renovation each additional 10,000 sq ft | $198 | |
Residential new, addition, alteration or renovation | $449 |
Fire Apparatus Access, Site Improvements and Related Equipment
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
Roadway design | $503 |
Obstructions (traffic calming devices and other manipulated barriers) | $374 |
Temporary fire apparatus access roadways | $449 |
Miscellaneous System Plans
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
$771
Miscellaneous Construction Permit - per hour
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
$409
Fuel Modification
Includes (1) plan review, (1) re-submittal, (1) field inspection and (1) re-inspection
$1,165
Additional plan review
$319
Plan Reviews or Specialized Consultation
The use of an independent specialized consultant with expertise to conduct the review is sometimes necessary. Projects subject to this provision will be charged on an hourly basis and shall not exceed the actual cost to the District.
Actual Cost
Each Additional Field Inspection
$338
After hours inspection - per hour with a 2 hour minimum
Includes (1) field inspection
Fees assessed under this provision shall be due and payable prior to the action of the District. This provision is not a mandate on the District to normally provide this service. This service is subject to staff availability and does not mandate performance. Fee is $475 per hour with a 2 hour minimum required.
$489
Expedited Plan Review - per hour with a 2 hour minimum
Includes (1) plan review
Fees assessed under this provision shall be due and payable prior to the action of the District. This provision is not a mandate on the District to normally provide this service. This service is subject to staff availability and does not mandate performance. Fee is $475 per hour with a 2 hour minimum required.
$489
Alternate Materials and Methods of Construction Review
Includes (1) plan review and (1) re-submittal
Additional costs may incur should the District use an independent specialized consultant to evaluate the submittal.
$412
Permit Renewal or Extension
50% Original Fee